Hi Wepo12,10 to 50 k .. hmm.. I thought of just changing the kitchen and toilets .. I thought it will be less than 20k .. can that be done? thnks
If you're on tight budget, you can actually engage a contractor and ask for a quote. Or engage contractor for their labor, you get the materials yourself.I want only touch up on the kitchen and both toilets of my 3 room flat. It will be ready by 2015. Roughly how much I need to prepare.. Would like some advise from experience mummys here... thanks you all
I have contractors contact if you need any.If you're on tight budget, you can actually engage a contractor and ask for a quote. Or engage contractor for their labor, you get the materials yourself.
I think can be less than 10k (if you source the materials yourself and engage a contractor.) I'm also waiting for my 3R New flat. I got a contractor's rough quote (max 3K for my Kitchen Cabinet, fridge base, etc)